There are currently severe delays on the M25 on both carriageways near Bricketwood.

The delay has been caused by a broken down vehicle between junctions 22 and 21A on the clockwise carriageway, resulting in one lane being closed.

There is also a lane closed on the anti-clockwise carriageway between the same junctions due to an incident.

Normal traffic conditions are expected after 1.45pm.